Step 1 · Sources
Historical, geological, regulatory.
Four stages, with services proved and analysis accredited.
A desk study is the cheapest part of the process and it decides whether the intrusive work is targeted or scattered. Historical maps show what was on the site before, which is usually how contamination arrived. Done properly it sometimes concludes that no intrusive investigation is needed at all, which is an outcome we will report even though it is the smaller fee.
Historical, geological, regulatory.
What the site used to be.
A conceptual site model.
Including when to stop here.
Utility plans obtained.
Scanned and marked on site.
Positions confirmed before drilling.
Sealed so aquifers stay separate.
Striking a gas main or a live cable is the serious risk in this work, so we obtain records, scan and trace, and prove positions before anything goes into the ground. If services cannot be satisfactorily located we stop rather than risk it, and that decision is not negotiable against a programme or a weather window.
Samples go to an independent UKAS-accredited laboratory operating within the relevant soil certification scheme, and we will tell you which laboratory. We are not an accredited testing laboratory ourselves and we do not imply otherwise — a consultancy claiming accreditation it does not hold is the thing that causes a report to be challenged.
At located, recorded positions.
At an accredited laboratory.
Against the current framework.
With the limitations stated.
What the authority actually asked.
Data, assessment and conclusions.
Stated, not buried in an appendix.
Decision remains the authority's.
Every report says what it cannot tell you: an investigation characterises conditions at the points sampled on the dates sampled, and ground varies in between. We will not write a sentence that reads as certifying a site clean, because no investigation can do that and a developer relying on such a sentence is relying on nothing.
A free scoping conversation and a written quotation, with the scope set out.